REFERENCES

Karakurt Dam and HEPP Project

2014 / Justification and Revised Feasibility Report

Investor                : Energo-Pro Electricity Production Industry and Trade Inc.

Poject Location     : Kars / Sarıkamış

Installed Capacity   : 99.50 MWm

Situation                     : In Design Stage

Sarıtaş Weir and HEPP Project

2012 / Feasibility, Final and Application Projects

Investor                : Mum Energy Industry and Trade Inc.

Poject Location     : Van / Başkale

Installed Capacity   : 19.35 MWm

Situation                     : In Construction Stage

Gecür Weir and HEPP Project

2011 / Final and Application Projects

Investor                : Akar Energy Industry and Trade Ltd. Co.

Poject Location     : Giresun / Çanakçı

Installed Capacity   : 3.227 MWm

Situation                     : In Operation

Andon Drinking Water Pipeline HEPP Project

2012 / Feasibility Report

Investor                : Rize Municipality

Poject Location     : Rize / Andon

Installed Capacity   : 4.20 MWm

Situation                     : In Construction Stage

Balıköy Weir and HEPP Project

2014 / Feasibility, Final and Application Projects

Investor                : Akar Energy Industry and Trade Ltd. Co.

Poject Location     : Kütahya / Tavşanlı

Installed Capacity   : 4.50 MWm

Situation                     : In Design Stage

Termessos Water Pipeline HEPP Project

2012 / Feasibility Report

Investor                : Antalya Municipality

Poject Location     : Antalya / Merkez

Installed Capacity   : 1.95 MWm

Situation                     : In Design Stage

Iğdır Drinking Water Pipeline HEPP Project

2013 / Feasibility Report

Investor                : Iğdır Municipality

Poject Location     : Iğdır / Center

Installed Capacity   : 6.55 MWm

Situation                     : In Design Stage

Finike Drinking Water Pipeline HEPP Project

2012 / Pre-Examination Report

Investor                : Finike Municipality

Poject Location     : Antalya / Finike

Installed Capacity   : - MWm

Situation                     : In Design Stage

Kemer Drinking Water Pipeline HEPP Project

2012 / Pre-Examination Report

Investor                : Kemer Municipality

Poject Location     : Antalya / Kemer

Installed Capacity   : - MWm

Situation                     : In Design Stage

Araklı Drinking Water Pipeline HEPP Project

2013 / Feasibility Report

Investor                : Araklı Municipality

Poject Location     : Trabzon / Araklı

Installed Capacity   : 1.134 MWm

Situation                     : In Design Stage

Please reload